Plan of Procedures
This plan of
procedure will detail exactly what steps I will go through in order to
construct each part of the water flow system. This system will consist of pvc
piping for the water transportation system and filtration system, environmental
controlling devices such as air stones, salinity meters, water chillers, and
thermometers, and materials to be used in the filtration system, which includes
a fine mesh net and a bacterial solution.
3D AutoCAD representation:
Parts needed:
|
Part name
|
Quantity
|
Use
|
|
|
2” PVC piping
|
10’
|
Pipes
|
|
|
PVC 90 degree elbow
|
10
|
PVC elbows
|
|
|
PVC couplings
|
10
|
Connect pipes
|
|
|
Air stones
|
4
|
Add DO to water
|
|
|
Coolworks Ice Probe with power supply
|
1
|
Cool water
|
|
|
Coolworks Proportional Temperature Controller
|
1
|
Control water
temperature
|
|
|
Aquarium Submersible Pump NP-80
|
1
|
Pump water through
system
|
|
|
Fine mesh net
|
1
|
Filter water
|
|
|
Mainstays kid’s 10
gallon rope tub
|
1
|
Reservoir tank
|
|
|
PVC Tee 2” connector
|
2
|
Connect long straight piece to
pipes
|
|
|
Tool name
|
Quantity
|
Use
|
|
Super glue
|
1
|
Seal holes
|
|
Drill
|
1
|
Drill in screws
|
|
Ruler
|
1
|
Measure
|
|
Band saw
|
1
|
Cut PVC
|
|
Drill press
|
1
|
Drill holes in PVC
|
Procedure:
1.
Take
the 10’ piece of PVC pipe(P1) and cut 2” off with the band saw(T4). Cut the 2”
pieces in half with T4.
2.
Attach
90 degree connector PVC piece(P2) to each of the 1” pieces with the PVC
couplings(P3).
3.
Cut
50” from P1 with T4. Then cut the 50” piece in half.
4.
Attach
each 25” PVC to the opposite end of the P2 attached to the 1” PVC pieces with
P3.
5.
Attach
P2 to the end of each 25” PVC pipes with P3.
6.
Attach
PVC Tee connectors(P10) to the end of the P2 that are attached to each 25” PVC
piece.
7.
Attach
a P2 to the end of each end of each P10 with a P3.
8.
Using
drill press(T7), drill 2” hole in side of Mainstay’s 10 gallon kid’s rope
tub(P9) and seal with super glue(T1).
9.
Using
drill press(T7), drill 1” hole in opposite side of Mainstay’s 10 gallon kid’s
rope tub(P9) 1” from the bottom.
10. Insert Coolworks Iceprobe(P5) and
seal with super glue(T1) and attach Coolworks Iceprobe temperature
controller(P6) with cables.
11. Insert air stone (P4) in to each
compartment of tank, connecting the tubes from the air supply to each stone.
12. Cut slit in side of drainage
pipe(supplied by Ms. Synek) with band saw(T4).
13. Cut fine mesh net(P8) in to a 2 inch
diameter circle and insert inside lip of drainage pipe.
14. Hook pump(P7) on to inside of
Mainstays kids 10 gallon robe tub(P9) inside the opening of the PVC 90 degree
elbow connection(P2).